Evaluate(Object[]) Method


The args contains 2 - 3 items: start_date, ,end_date, [holidays].

Start_date is a date that represents the start date.

End_date is a date that represents the end date.

[Holidays] is an optional range of one or more dates to exclude from the working calendar, such as state and federal holidays and floating holidays. The list can be either a range of cells that contains the dates or an array constant (array: Used to build single formulas that produce multiple results or that operate on a group of arguments that are arranged in rows and columns. An array range shares a common formula; an array constant is a group of constants used as an argument.) of the serial numbers that represent the dates.

Returns the number of whole working days between start_date and end_date.
Syntax
'Declaration
 
Public Overloads Overrides Function Evaluate( _
   ByVal args() As System.Object _
) As System.Object
'Usage
 
Dim instance As CalcNetWorkdaysFunction
Dim args() As System.Object
Dim value As System.Object
 
value = instance.Evaluate(args)
public override System.object Evaluate( 
   System.object[] args
)

Parameters

args

The args contains 2 - 3 items: start_date, ,end_date, [holidays].

Start_date is a date that represents the start date.

End_date is a date that represents the end date.

[Holidays] is an optional range of one or more dates to exclude from the working calendar, such as state and federal holidays and floating holidays. The list can be either a range of cells that contains the dates or an array constant (array: Used to build single formulas that produce multiple results or that operate on a group of arguments that are arranged in rows and columns. An array range shares a common formula; an array constant is a group of constants used as an argument.) of the serial numbers that represent the dates.

Return Value

A System.Int32 value that indicates the evaluate result.
Requirements

Target Platforms: Windows 7, Windows 8 Desktop, Windows Vista SP1 or later, Windows Server 2000, Windows 2000 Professional, Windows XP Professional, Windows NT 4.0 Workstation, SP6, Windows NT 4.0 Server, SP6

See Also

Reference

CalcNetWorkdaysFunction Class
CalcNetWorkdaysFunction Members
Overload List

 

 


Copyright © GrapeCity, inc. All rights reserved.